Tiếng Việt
A. Project introduction:
The Bac River hydropower project is built on the Bac River in Tan Trinh commune, Quang Binh district, Ha Giang province, Song Bac hydropower project with an installed capacity of about 42MW, average annual power of about 166.51 million kwh for the needs of the national and regional electricity system in Ha Giang province
B. Customers:
Electrical Engineering and Construction One Member Limited Company
C. Goods provided by Hoang Duong.
1. Joints of 40Cr mark for arch valve rotating bearings
2. Bearing 40CrNiMoA for the arch valve
3. Fit for the bow valve swingarm